Dell PowerApp 100 Guia De Instalacion página 13

Idiomas disponibles

Idiomas disponibles

support.dell.com
   
This procedure provides instructions for installing a Dell system in a two-post open-
frame relay rack, such as those found in telecommunications equipment facilities.
Both 3-inch and 6-inch wide 2-post racks are accommodated.
The two-post open-frame relay rack must be properly secured to the floor, to the
ceiling or upper wall, and where applicable, to adjacent racks, using floor and wall
fasteners and bracing specified or approved by the rack manufacturer or by industry
standards. Refer to the two-post open-frame relay rack manufacturer's installation
documentation for precautionary warnings and information before attempting this
installation.
               
           ! 
       "  
See "Safety Instructions" found earlier in this guide for additional safety information
regarding rack installation.
  
The two-post flush-mount rack kit includes the following items (see Figure 1-4):
Two flush-mount brackets
Two inner mounting rails
Four 12-24 x 0.5-inch pan-head Phillips (or slotted) screws
Four 10-24 x 0.25-inch flat-head slotted screws for securing the inner mounting
rails to the sides of the system
One 1-U template
Rack Installation Guide
1-5
loading

Este manual también es adecuado para:

Powerapp 110Poweredge 350