Electrical Installation - SICK RAY10 Instrucciones De Operación

Ocultar thumbs Ver también para RAY10:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 82
6

ELECTRICAL INSTALLATION

6
Electrical installation
6
Operation in standard I/O mode:
The sensors must be connected in a voltage-free state (U
tion must be observed, depending on the connection type:
Plug connection: note pin assignment
Cable: wire color
Only apply voltage/switch on the voltage supply (U
tions have been established.
Operation in IO-Link mode: Connect the device to a suitable IO-Link master and inte‐
grate in the master or control via IODD/function block. The green LED indicator flashes
on the sensor. IODD and function block are available to download from
under the part number.
Explanation of the connection diagram (Tables 1-4):
Alarm = alarm output (see
MF = multifunctional, programmable output
n. c. = not connected
QL1/C = switching output, IO-Link communication
DC: 10 ... 30 V DC,
Table 1: RAY10 with IO-Link
1
BN
2
WH
3
BU
4
BK
Default: MF
Default Q
/C
L1
V
table 3
and
table
7)
see "Technical data", page 15
+ (L+)
MF
- (M)
Q
/C
L1
Q
Q
0.14 mm
2
AWG26
= 0 V). The following informa‐
V
> 0 V) once all electrical connec‐
www.sick.com
+ (L+)
+ (L+)
MF
- (M)
- (M)
Q
/C
Q
L1
Q
Q
2
4
4
1
3
1
Subject to change without notice
MF
/C
L1
Q
Q
3
2
8022198 | SICK
loading