Kohler STERLING 600C Serie Guia De Instalacion página 8

Ocultar thumbs Ver también para STERLING 600C Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Seal here.
6. Caulk the Bottom Track
Apply a silicone sealant in the front groove on the underside of the bottom track.
Apply a second, smaller bead of silicone sealant to the other edge on the underside of the bottom
track.
Install the bottom track on the ledge at the marked location.
7. Install the Wall Jambs
Place a wall jamb over the bottom track with the shorter leg facing out. Align the holes in the wall
jamb with the holes in the wall.
Make sure the wall jamb is sitting flat against the wall and is fully engaged with the bottom track.
Attach the wall jamb to the wall using #8-18 x 1-1/4" panhead screws in the top and bottom holes.
With the bent flange facing the inside of the shower, attach the wall bumper to the center hole of
the wall jamb with a #8-18 x 1-1/4" panhead screw.
Repeat the procedures with the other wall jamb.
1034040-2-B
Seal here.
Seal here.
Bumper
Short
Leg
8
Screw
Bent
Flange
#8-18 x 1-1/4"
Panhead Screw
Sterling
Tabla de contenido
loading

Tabla de contenido