Kohler STERLING 600C Serie Guia De Instalacion página 7

Ocultar thumbs Ver también para STERLING 600C Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Wall Jamb
5. Mark the Wall Jamb Locations
Position a wall jamb against the wall directly over the bottom track with the shorter leg facing out.
The wall jamb should sit flat against the wall.
Slide the wall jamb down over the bottom track until the wall jamb and bottom track are fully
engaged.
IMPORTANT! The wall jamb must sit flat on the bottom ledge. If your ledge has a curve in the corners at
the side wall, it may be necessary to shape the bottom end of the wall jamb with a file.
Use a level to plumb the wall jamb vertically.
Using the pre-drilled screw holes as a guide, mark the hole locations on the wall.
Repeat the procedures with the second wall jamb.
Remove the bottom track and wall jambs.
NOTE: When installing on ceramic tile, use a center punch to nick the surface of the glaze. Tap the center
punch lightly with a hammer to avoid cracking the tile.
Lightly center punch the hole locations.
Drill a 5/16" hole at each mark. Use a tile or masonry bit for ceramic tile.
Press and hold the legs of each wall anchor (provided) together and insert the wall anchor legs into
the pre-drilled mounting holes.
Repeat for all the wall anchors.
Thoroughly clean the shower floor ledge and wall.
Sterling
Short Leg
Anchor
Press and hold legs together.
7
1034040-2-B
Tabla de contenido
loading

Tabla de contenido