Ocultar thumbs Ver también para PowerValue 11 RT:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 60

Installation

Planning before installation
Install the unit to a position where any danger to the UPS is minimized to ensure a
long service life:
Install the UPS indoors.
Leave 25 cm of space on each side of the cabinet to enable cooling airflow and
ensure that the circulation of air to the ventilation slits is not obstructed.
Avoid excessively high temperature and excessive moisture.
Make sure that the surface is solid and flat.
Rack mount installation – requires rack mounting kit, to be purchased
separately
PowerValue 11 RT can be installed in a 19-inch rack. Both the UPS and the external
battery enclosure are 2U in height.
Align the rack mounting ears on the side of the UPS and tighten the screws.
(Fig.1)
Assemble the rack rails with the rack-mounting kit. (Fig.2)
Slide the UPS into the rack rail and lock it into the structure. (Fig.3)
Tighten the screws and then proceed with wiring of the UPS .
Tower installation
Place the UPS in a vertical position with the front panel screws orientated as in
Fig.4
Place the two stands on a horizontal surface (Fig.4)
Place the UPS carefully on the UPS stands (Fig.4-5)
Pull out the LCD box. Rotate it 90º clockwise and then push it back into the front
panel (Fig.6-7)
Quick guide | PowerValue 11 RT 1-3 kVA 15
1 e n
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

1-3 kva b1-3 kva sPowervalue 11 rt 1 -3 kva вPowervalue 11 rt 1 -3 kva s

Tabla de contenido