Unpacking - Champion 100199 Manual Del Usuario

Ocultar thumbs Ver también para 100199:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Model 100199

UNPACKING

UNPACKING
!
The HSB weighs more than 300 lbs.
(136 kg). Use the aid of additional
assistants and exercise caution
during installation.
Inspect the generator for damaged or loose parts. DO NOT
operate the generator if any components are damaged or loose.
Contact your dealer for assistance.
1.
Cut banding straps
2.
Remove top lid
3.
Remove center cardboard supporting rib
4.
Lift cardboard housing and set aside with all other trash
5.
Remove plastic covering and discard
6.
Remove 4 securing clamps. Save if going to use anchor
bolts to secure to concrete pad
7.
Insert 2 lifting rods (not supplied) into lifting notches at
each end of the base
8.
Discard all shipping materials and recycle if possible
• If you know length of run for wires you may want
to install the ATS communication wires and voltage
wires now before setting unit to industry 1st 17.7 in.
from fire rated wall and when code permits. Install
the wires, some of the gas delivery pipes and flex
hose now while you have ample room and at tailgate
height is much easier than when in place
• Cardboard can be used for kneeling
20
Part No. 101049 Rev. B
WARNING
NOTICE
Tabla de contenido
loading

Tabla de contenido