Assembling The Balance - Mettler Toledo XPR26PC Manual De Usuario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 57
4 Carefully tilt the balance to its side.
5 Lead the cable (7) through the cable channel (8).
6 Carefully put the balance back on its feet.
7 Insert the terminal cable (9) into the socket of the
balance (10). Consider the pin assignment.
The terminal is ready.

4.4.2 Assembling the balance

1 Install the front cover (1).
2 Carefully hang the pipetting container support (2) on the
hooks (3).
The pipetting container support (2) hangs freely.
3 Carefully place the pipetting container (4) onto the
pipetting container support (2).
4 Center the drip tray (5) underneath the pipetting container
(4).
5 Carefully slide the pipetting base (6) with the evaporation
trap container (7) vertically along the guiding rails and
place it onto the drip tray.
The pipetting base centers the drip tray. It does not
touch the pipetting container (5) or the pipetting
container support (3).
6 Place the centering ring (8) onto the evaporation trap
container (7).
7 Carefully place the evaporation trap cover (9) onto the
evaporation trap container (7).
12
10
9
4
2
3
5
1
9
8
7
6
Pipette Calibration Balances
8
7
Tabla de contenido
loading

Tabla de contenido