Software Update - Olimpia splendid SHERPA AQUADUE S2 BIG Instrucciones Para La Instalación, Uso Y Mantenimiento

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

• FTV1:
• FTV2:
• CO%:
Press the icon with the diagram to access the trend of the
temperatures acquired in the last hour of operation screen.
To move inside the diagram:
- Press the right or left arrow to move the cursor.
- Press directly on the diagram to move to the desired position.

5.9 - SOFTWARE UPDATE

In case it is necessary to update the software of the internal unit, proceed as follows:
a. From the System screen, check the software versions of the display board and power board
• Proceed with the software update only if strictly necessary
• Each software update entails the rewriting of Service parameters to their factory value. At the
end of the updated, all or part of these parameters will have to be manually and opportunely
reconfigured to adapt them to your own system.
b. Empty an USB memory device completely (it must be without files and folders)
c. Load the files listed below in the USB memory device
OLMP_PDC_PU2.bin
Update.Fw
Update.fw.md5
updateFw
d. Disconnect all power supplies, of both the internal and external unit
e. Connect the USB memory device in port USB1 of the power board
f.
Power the internal unit
g. The power board software update starts automatically. At its completion, the display of the internal unit
is operational again.
h. Disconnect all power supplies. Remove the USB memory device.
i. Connect the USB flash drive to port USB2 of the display board
l.
Power the internal unit
m. The display board software update starts automatically. At its completion, the display of the internal unit
is operational again.
n. Disconnect all power supplies. Remove the USB memory device.
o. Restore all power supplies.
p. Access page MENU -> SERVICE and press "RESET" to update all parameters.
q. From System screen, check that the display and power boards software versions are correct.
r. Access parameters "ADDR370" and "ADDR371" to configure the heat pump correctly.
EN - 36
input from photovoltaic or smart grid system (terminal 8 of power board, short with L for
activation)
input from photovoltaic or smart grid system (terminal 9 of power board, short with L for
activation)
IN / OUT shows IN capacity (supplied by the external unit) and OUT capacity (requested
to the external unit)
Tabla de contenido
loading

Este manual también es adecuado para:

Sherpa tower s2 12Sherpa tower s2 14Sherpa tower s2 16Sherpa tower s2 12tSherpa tower s2 14tSherpa tower s2 16t ... Mostrar todo

Tabla de contenido