Install The Tower; Water Test The System - Kohler K-1000-H2 Guia De Instalacion

Ocultar thumbs Ver también para K-1000-H2:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

19. Install the Tower

Locate the pin at the bottom left corner of the tower. Insert this pin into the bottom left corner hole
in the mounting frame bracket. Align the hole at the top left corner of the tower with the slotted
hole in the mounting frame and thread a 3/8" bolt through the mounting frame and into the tower.
Securely wrench tighten the bolt.
Securely hand tighten the tower union nut to the mounting frame union. Be sure the union O-ring is
in place.
Carefully pivot the tower closed. Align the holes at the top and bottom right corners of the tower
with the slotted holes in the mounting frame. Thread a 3/8" bolt through the mounting frame and
into the tower at the top and bottom. Tighten the bolts securely, but do not overtighten.
You will water test and inspect the tower and mounting frame later, so you may want to install and
hand tighten only one of the required bolts at this time. Both bolts will need to be securely
tightened later.

20. Water Test the System

Allow the silicone sealant and any finished wall materials or grout to fully cure before proceeding.
Follow all manufacturer's recommendations regarding water exposure to their products, as well as
product cure times.
Make sure all PVC union connections are securely hand tightened and that all union connections
use an O-ring.
Kohler Co.
Tower
Pin
Mounting Frame Hole
Bottom Left Corner View
CHECK POINT # 10.
Confirm that:
The faucet trim and spout are
installed.
The drain is installed.
The footbath basin has been
filled with water and checked
for leaks.
The door enclosure is
installed.
The tower is installed.
Top Left
Corner View
Tower
Union Nut
Bolt
Tower
Mounting
Frame
Mounting
Slotted
Frame
Hole
Union
25
1030200-2-C
Tabla de contenido
loading

Este manual también es adecuado para:

K-1001-h2

Tabla de contenido