•
Accessories and changes to the product that are
not approved by the manufacturer, can cause
serious injury or death. Do not change the
product. Always use accessories that are
approved by the manufacturer.
•
If the maintenance is not done correctly and
regularly, the risk of injury and damage to the
product increases.
To remove the product from the
carton
1. Remove loose parts included with the product.
Cut the four corners of the carton and put the
end panels down flat.
Loose parts
(Fig. 36)
Knob (3)
(Fig. 38)
ON/OFF key (s)
(Fig. 40)
Handle knobs (2)
(Fig. 42)
Shear pins ¼-20 x 1-¾ (6)
(Fig. 44)
Locknut 5/16-18 (1)
(Fig. 46)
Nylon washer (1)
(Fig. 48)
Spring (1)
To install the handle
1. Raise the upper handle to the operating position.
(Fig. 50)
2. Adjust the handle position to one of the mounting
holes (B) and tighten the handle knobs (C) with
the carriage bolts (D). (Fig. 51)
3. Install more carriage bolts (D) and handle knobs
(C) to secure the upper handle (A) to the lower
handle (E). (Fig. 52)
To install the chute deflector and
chute rotator head
1. Put the chute deflector assembly on the top of
the chute base with the discharge opening in the
direction of the front of the product.
2. Put the chute rotator head (A) on the chute
bracket (B). Rotate the chute assembly to align
the pins under the chute rotator head with the
holes in the chute bracket if it is necessary.
3. Put the chute rotator head on the pin (C) and the
threaded stud (D) on the mounting bracket (E).
12
•
Only do the maintenance as given in this
operator's manual. All other servicing must be
done by an approved service agent.
•
Let an approved service agent do servicing on
the product regularly.
•
Replace damaged, worn or broken parts.
Assembly
2. Remove the two screws that attach the auger
housing to the pallet. Remove the steel brackets
from the skid plates if they have it.
3. Remove all package materials.
4. Remove the product from the carton and make
sure no loose parts are left in the carton.
(Fig. 37)
(Fig. 39)
(Fig. 41)
(Fig. 43)
(Fig. 45)
(Fig. 47)
(Fig. 49)
4. Attach a locknut (G) on the threaded stud and
tighten. (Fig. 53)
5. Put the cables through the double clip (I) to
attach the rotator cables (H) to the lower handle.
(Fig. 54)
To install the chute deflector remote
control
1. Attach the remote cable bracket (A) to the
discharge chute with a carriage bolt (B) and a
5/16-18 locknut (D). Tighten the bolt.
2. Install the remote cable eyelet (E) to the chute
deflector (F) with a shoulder bolt (G), a nylon
washer (C), and tighten with a ¼-20 locknut (K).
The cable eyelet will be loose on the shoulder
bolt.
3. Attach the spring (L) between the hex nut (M) on
the chute rotator head and the hole on the chute
deflector. (Fig. 55)
4. Attach the lever control knobs (N) by pressing
them down on the control levers (O). (Fig. 56)
Discharge chute (1)
Carriage bolts 5/16-18 x 2 ¼" (2)
Locknut 3/8 (1)
Locknuts ¼-20 (6)
Locknut ¼-20 (1)
Carriage bolt 5/16-18 x 5/8 (1)
Shoulder bolt ¼-20 (1)
1674 - 004 - 18.05.2021