Motor Overriding System; Installation Layout - V2 GOLD400D Manual Del Usuario

Ocultar thumbs Ver también para GOLD400D:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

MOTOR OVERRIDING SYSTEM

In case of a blackout, the gate can be operated directly from the
motor. Insert the key supplied in the lock 1 on the front side of
the motor, perform 1/4 of a turn and open the plastic door
completely.
To restore the automation, simply close the door, rotate the key
in closed position and slide the specially provided plastic cover
onto the lock.
Power supply
Blinker
External Aerial
Digital or key selector

INSTALLATION LAYOUT

cable 3 x 1,5 mm
2
(T100°C)
cable 2 x 1,5 mm
2
cable RG-58
cable 2 x 1 mm
2
m
WARNING: In case the leaf overruns its final position
and impacts against the safety stroke end (i.e. wrong
regulation of the limit switches),and a manual unclamp
would be necessary, before using the above procedure,
you have to replace the leaf setting away from the safety
stroke end using the flat screw on the main motor shaft 2
with a screwdriver.
Internal Photocellules
External Photocellules
Safety edge (EN 12978)
30
cable 4 x 0,5 mm
2
(RX)
cable 2 x 0,5 mm
2
(TX)
-
Tabla de contenido
loading

Este manual también es adecuado para:

Gold800dGold1200d

Tabla de contenido