Install Upper Flue Mounting Bracket - Best WBF4I Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALL UPPER FLUE MOUNTING BRACKET

Recommended
distance between
screw holes
Ceiling
1. Drill two
" diameter holes where shown. Insert drywall an-
5
1 6
chors into the holes.
2. Center the bracket over the hood location and flush with the
ceiling. Make sure that the slots of the upper flue bracket are
at the bottom. Secure the upper flue bracket to the wall using (2)
#8 x 1½" mounting screws.
3. Tighten the screws completely. Make sure that the bracket is
tight against the wall.
Center of installation
L
C
7½"
3¾"
Center of
installation
C
L
Upper flue mounting
bracket slots
Ceiling
1
"
1
8
Ø 5/16" TYP.
Flush with
the ceiling
- 9 -
Tabla de contenido
loading

Tabla de contenido