Best WBF4I Manual De Instrucciones página 11

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

10. Measure and install 6" round metal
ductwork to roof cap or wall cap
and 90
elbow over duct collar on
0
hood. Use duct tape to make all
joints secure and air tight.
11. Plug hood power cord into the
outlet.
12. Remove the upper flue from inside
the lower flue. Install the lower flue
bracket to the lower flue using (2)
flue bracket screws no. 8 x 3/8" .
Make sure that the slots are at the
top. Carefully replace the upper
flue inside the lower flue, with the
upper flue recirculation slots and
(2) bracket holes on top. Remove
protective plastic film covering the
lower flue only.
13. Carefully place both flues on top of
the hood.
Tabs on bottom edge of lower flue
fit into slots on top of hood.
14. Slide the upper flue upward until
it is aligned with its upper flue
mounting bracket. The bracket
should be inside the flue. Secure
the upper flue to the upper flue
mounting bracket using (2) no. 8 x
3/8" mounting screws.
15. Remove protective plastic film
covering the upper flue and the
hood.
6" ROUND
ELBOW
LOWER FLUE MOUNTING BRACKET
UPPER FLUE MOUNTING BRACKET
FRONT VIEW
UPPER FLUE
RECIRCULATION
BRACKET HOLES
- 11 -
LOWER
FLUE
SLOTS &
Tabla de contenido
loading

Tabla de contenido