USE & OPERATION
COOLER LOCATION
Make sure to position the air cooler on a flat floor base with appropriate cross-ventilation, before you
set up and start using the product. Please refer to the COOLER LOCATION section of the separate
Safety & Maintenance Guide.
BASE INSTALLATION (OPTIONAL)
Before installation, make sure the unit is unplugged from the
electrical outlet and that no water is inside the unit.
Prior to use, you must move the air cooler to the position you
would like it to stand. If you don't intend to move the air cooler
around often, it is recommended to install the bottom base
stands on the 4 corners of the unit for added balance and
support.
Warning: When the bottom base stands are installed, the unit
will not roll on the wheels. Remove the stands before rolling
and repositioning to another room.
Installation Steps:
Step 2:
Install the 4 bottom base stands on each corner
of the unit. Slide and lock them into place.
Warning: When operating the unit, take care not to tip the unit over. When moving the air cooler,
make sure all water is removed from the unit. Move it slowly and carefully to avoid tipping the unit
over.
Step 1:
Carefully tip the unit horizontally onto one side.
EN
Step 3:
Use a screwdriver to tighten ONE screw on
each of the four base stands.
2
Base