1
2
011257
CAUTION:
Return the gear to the original position in such a
•
manner as it was installed if it should be taken
away by mistake.
Installing the shear blades
Prepare 4 removed screws (For under cover), 2 screws (For
shear blade), plate, under cover, and new shear blades.
Adjust the crank position as shown in the figure. At this
time, apply some grease provided with new shear
blades to the periphery of the crank.
1
011258
Overlap the oval hole in the upper blade with that in the
lower one.
1
011259
Take out the blade cover from the old shear blades and
fit it onto the new ones for easy handling during the
replacement of blades.
1. Screws
2. Shear blade
1. Crank
1. Oval hole of
shear blade
10
009302
Place the new shear blades on the tool so that the oval
holes in the shear blades fit onto the crank. Overlap the
holes in the shear blades with the screw holes in the
tool and then secure them with two screws.
1
2
014773
Check the crank for smooth turn with a slotted
screwdriver.
1
011261
Install the plate, under cover on the tool. Tighten the
screw firmly.
NOTE:
There is no distinction between the top and bottom
•
of the plate.
Remove the blade cover and then turn on the tool to
check it for proper movement.
NOTE:
When the shear blades does not operate properly,
•
there is a poor fit between the blades and crank.
Redo from the beginning.
1. Oval hole of
shear blade
2. Crank
3. Screws
3
1. Crank