PREPARE THE OPENING
Installation over a GE Oven:
Min.
* If you are replacing a GE electric double oven
with the combined installation of an Advantium
120 and a single oven, use the dimensions shown.
The middle rail separating the two openings may
Installation Preparation
(CONT.)
Construct Solid
Bottom Min.
Supported by
Runners all
Four Sides
Per Oven
Requirement
PREPARE THE OPENING
Installation over a GE Oven and Warming
Drawer:
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location do
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.
CAUTION:
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of the 75-pound product, plus additional oven
loads of up to 50 pounds or a total weight of 125
pounds.
REMOVE THE PACKAGING
7
(CONT.)
Construct
Solid Bottom
Plywood
Supported by
Runners all
Four Sides
Per Oven
Requirement
For personal safety, the