GE Advantium PSB1000 Serie Instrucciones De Instalación
GE Advantium PSB1000 Serie Instrucciones De Instalación

GE Advantium PSB1000 Serie Instrucciones De Instalación

Ocultar thumbs Ver también para Advantium PSB1000 Serie:
Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

Installation
Instructions
Questions? Call 800.GE.CARES (800.432.2737) or visit our Website at: GEAppliances.com
BEFORE YOU BEGIN
Read these instructions completely
and carefully.
IMPORTANT
for local inspector's use.
IMPORTANT
codes and ordinances.
• Note to Installer - Be sure to leave these
instructions with the Consumer.
• Note to Consumer - Keep these instructions for
future reference.
• Skill level - Installation of this appliance requires
basic mechanical and electrical skills.
• Completion time - 1 hour
• Proper installation is the responsibility of the
installer.
• Product failure due to improper installation is not
covered under the Warranty. See Owner's
Manual for warranty information
IMPORTANT:
• Use this oven only for its intended purpose.
• Never use the oven for warming or heating a
room. Prolonged use of the oven without proper
ventilation can be hazardous.
CONTENTS
Models Available .................................................................... 2
Product Dimensions and Clearances .......................... 2
Tools Required ........................................................................ 2
Parts Supplied ........................................................................ 2
Advance Planning ................................................................ 3
Electrical Requirements .................................................... 4
Prepare the Opening ...................................................... 5, 6
Remove the Packaging ...................................................... 6
- Save these instructions
- Observe all governing
.
Profile Advantium
SpeedCook Ovens
CAUTION:
For personal safety, remove house fuse or oven
circuit breaker before beginning installation to avoid
severe or fatal shock injury.
CAUTION:
For personal safety, the mounting surface must be
capable of supporting the cabinet load, in addition
to the added weight of the 75-pound product, plus
additional oven loads of up to 50 pounds or a total
weight of 125 pounds.
CAUTION:
For personal safety this product cannot be
installed in cabinet arrangements such as an island,
a peninsula or below a countertop.
For a Spanish version of this manual,
visit our Website at GEAppliances.com.
Para consultar una version en español
de este manual de instrucciones, visite
nuestro sitio de internet GEAppliances.com.
Step 1, Slide the Oven into the Cutout ........................ 7
Step 2, Install Bottom Trim ................................................ 7
Step 3, Install Mounting Screws ...................................... 8
Step 4, Finalize Installation................................................ 8
MFL59060902
120 Built-In
PSB1000 PSB1001
49-40607 02-09 JR

Capítulos

Tabla de contenido
loading

Resumen de contenidos para GE Advantium PSB1000 Serie

  • Página 1: Tabla De Contenido

    120 Built-In ™ Installation SpeedCook Ovens Instructions PSB1000 PSB1001 Questions? Call 800.GE.CARES (800.432.2737) or visit our Website at: GEAppliances.com BEFORE YOU BEGIN CAUTION: Read these instructions completely For personal safety, remove house fuse or oven and carefully. circuit breaker before beginning installation to avoid severe or fatal shock injury.
  • Página 2: Design Information

    Design Information MODELS AVAILABLE Profile Models: PSB1000WW – White PSB1000BB – Black PSB1001SS – Stainless Steel PRODUCT DIMENSIONS AND CLEARANCES 22-9/16" 26-3/4" 1-1/8" 21-1/2" 18-5/8" 13" 1-1/16" 13/16" NOTE: Appearance may vary slightly by model. TOOLS REQUIRED PARTS SUPPLIED • #2, Phillips screwdriver •...
  • Página 3: Advance Planning

    • Cabinets installed adjacent to wall ovens must have • This oven can be installed over any GE single electric an adhesion spec of at least 194ºF temperature built-in oven or a warming drawer or both.
  • Página 4: Installation Preparation

    Installation Preparation ELECTRICAL REQUIREMENTS Single Advantium 120 Installation: This product requires a 120-volt, 60 Hz, 15-amp circuit and draws 1.8 kilowatts. This product must be connected to a supply circuit of the proper voltage and frequency. • Wire size must conform to the requirements of the National Electrical Code or the prevailing local code for this kilowatt rating.
  • Página 5: Prepare The Opening

    Installation Preparation PREPARE THE OPENING PREPARE THE OPENING (CONT.) The Advantium 120 can be installed in combination Installation over a GE Warming Drawer: with other GE appliances. Always follow each product’s Installation Instructions to complete 27" 23-1/2" Construct Solid Bottom the installation.
  • Página 6: Remove The Packaging

    2" Min. Min. 45-1/4" 9-1/4" *If you are replacing a GE electric double oven with the combined installation of an Advantium NOTE: Additional clearances between the cutouts 120 and a single oven, use the dimensions shown. may be required. Check to be sure the oven...
  • Página 7: Installation Instructions Step 1, Slide The Oven Into The Cutout

    Installation SLIDE THE OVEN INTO THE CUTOUT INSTALL BOTTOM TRIM • Align bottom trim tabs to slots in the bottom CAUTION: Two people are required of the oven. to lift the oven into the opening. Grasp the bottom at the front and rear. DO NOT USE THE HANDLE TO LIFT THE OVEN.
  • Página 8: Step 3, Install Mounting Screws

    Installation INSTALL MOUNTING SCREWS • Drill pilot holes through the side flanges, 2 on each side. • Drive the color-matched screws into the side flange. FINALIZE INSTALLATION • Turn the power on at the source. The interior light should come on when the door is opened. •...
  • Página 9: Antes De Iniciar

    120 Hornos ™ Instrucciones empotrados SpeedCook de instalación PSB1000 PSB1001 ¿Preguntas? Llame al 800.GE.CARES (800.432.2737) o bien visite nuestra página Web: GEAppliances.com ANTES DE INICIAR PRECAUCIÓN: Lea estas instrucciones completa Para su seguridad personal, retire el fusible y cuidadosamente. doméstico o el disyuntor antes de comenzar la instalación, para evitar lesiones severas o fatales.
  • Página 10: Información Sobre El Diseño

    Información sobre el diseño MODELOS DISPONIBLES Modelos Profile: PSB1000WW – Blanco PSB1000BB – Negro PSB1001SS – Acero inoxidable DIMENSIONES DEL PRODUCTO Y ESPACIO LIBRE 22-9/16" 26-3/4" 1-1/8" 21-1/2" 18-5/8" 13" 1-1/16" 13/16" NOTA: La apariencia puede variar levemente de modelo a modelo. HERRAMIENTAS NECESARIAS PARTES INCLUIDAS •...
  • Página 11: Planificación Anticipada

    • Este horno puede instalarse sobre cualquier potencia de temperatura de por lo menos 194°F. horno empotrado individual GE o sobre un cajón calentador, o ambos. El horno debe instalarse en forma segura en una alacena sujeta firmemente a la estructura de la casa.
  • Página 12: Preparación Para La Instalación

    Preparación para la instalación REQUISITOS ELÉCTRICOS Instalación única del Advantium 120: Este producto requiere un circuito de 120 voltios, 60 Hz, 15 amp y toma 1.8 kilovatios. Este producto debe conectarse a un circuito de alimentación del voltaje y la frecuencia adecuados. •...
  • Página 13: Prepare La Abertura

    PREPARE LA ABERTURA PREPARE LA ABERTURA (CONT.) El Advantium 120 puede instalarse Instalación sobre un cajón calentador GE: en combinación con otros aparatos GE. Siempre siga las indicaciones de instalación de cada Construya una base producto para realizar la instalación. inferior sólida de madera Instalación única del Advantium 120:...
  • Página 14: Retire El Embalaje

    9-1/4" *Si está reemplazando un horno eléctrico NOTA: Es posible que se requieran espacios doble GE por la instalación combinada de adicionales entre los cortes. Verifique para un Advantium 120 y un horno único, use las asegurarse de que los soportes del horno sobre dimensiones indicadas.
  • Página 15: Instalación

    Instalación DESLICE EL HORNO DENTRO INSTALE EL RECORTE INFERIOR DEL CORTE • Alinee las lengüetas del recorte inferior con las ranuras de la parte inferior del horno. PRECAUCIÓN: Se requieren dos personas para levantar el horno e introducirlo en la abertura. Agarre la parte inferior por delante y por detrás.
  • Página 16: Paso 3, Instale Los Tornillos De Montaje

    Instalación INSTALE LOS TORNILLOS DE MONTAJE • Realice orificios piloto con el taladro en los salientes laterales, 2 de cada lado. • Coloque los tornillos de color combinado en el saliente lateral. FINALICE LA INSTALACIÓN • Conecte la energía en la fuente. La luz interior se encenderá...

Este manual también es adecuado para:

Advantium psv1001 seriePsb1000wwPsb1000bbPsb1001ss

Tabla de contenido