HydroLift
Operation
9.2 Initial commissioning
Before initial commissioning, a "safety check" must be carried out by a qualified person. He
has to confirm the proper installation and the correct functioning of the lifting system. The
result of the test is to be documented in the form initial commissioning in the annex. (→
Annex Inspection log book)
10 Operation
10.1 Control elements
1. Display with control buttons
2. Battery level indicator
3. Group / resolve lifting units
4. Change grouping
5. Lifting
6. Emergency stop
7. Lower
8. Lower slowly
9. Set down on notch
10. Assign a position to the lifting unit on the
vehicle
11. LED display
12. Lighting
13. Set height limit
14. Clear fault codes
94
DANGER
Risk of death and injury
◼
Read and adhere to the operating instructions.
◼
The lifting unit may only be operated by properly trained workshop
personnel.
◼
Use the lifting unit only in a technically sound condition.
◼
Always keep the movement range of the load and the load-carrying
equipment unobstructed.
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[14]
[13]
[12]
[11]
[10]
[9]
[8]
126746