Installation Check-Up; Hot Water - Faema BARCODE Manual De Uso Y Instalación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 161
These chapters in the manual are to be used by qualified, authorized technical staff.

5. Installation Check-up

WARNING:
AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING TO THE
INSTRUCTIONS BELOW:
COFFEE CIRCUIT
Keep the coffee circuit wash key (

HOT WATER

Continuously dispense hot water
STEAM (where present)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
MILK CIRCUIT
Keep the milk circuit wash key (
information, please consult the "Cleaning and Maintenance" chapter).
SOLUABLES CIRCUIT (only for machines with solubles)
Keep the coffee circuit wash key (
mation, please consult the "Cleaning and Maintenance" chapter).
26)
pressed for a few seconds and follow the steps indicated on the display.
until at least 0.5 liters of water have been dispensed.
28)
pressed for a few seconds and follow the steps indicated on the display (for more
26)
and the milk circuit wash key (28)
50
pressed for a few seconds (for more infor-
Tabla de contenido
loading

Tabla de contenido