5. Installation Check-up
WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C).
WATER CONNECTIONS
•
No leaks from the connections or tubes
FUNCTIONING
•
Boiler and operating pressures are normal.
•
The pressure gauge is working properly.
•
The self-leveling device is working properly.
•
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
COFFEE CIRCUIT / MILK CIRCUIT / SOLUBLES CIRCUIT
•
Press the PRG (29)
touch screen.
HOT WATER
•
Continuously dispense hot water until at least 0.5 liters of water have been dispensed.
key and then the icon
; choose the type of wash cycle, and follow the instructions on the