Installation Check-Up; Hot Water - Faema BARCODE NEW TOUCH Uso E Instalacion

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 179

5. Installation Check-up

WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C).
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
COFFEE CIRCUIT / MILK CIRCUIT / SOLUBLES CIRCUIT
Press the PRG (29)
touch screen.

HOT WATER

Continuously dispense hot water until at least 0.5 liters of water have been dispensed.
key and then the icon
; choose the type of wash cycle, and follow the instructions on the
7 EN
Tabla de contenido
loading

Tabla de contenido