THE BALMORAL
2
2
2
2
Push header assembly HD1 all
the way into door lintel. Make
sure header is fully seated over
top of lintel.
Match up front and rear slope wall caps SC1 and SC2 for
2
4
2
4
both sides of building. Attach caps, pre-drilled holes facing
inside. Push down to fully seat.
2
3
Make sure corner posts and panels are
2
3
fully seated into base channels. Install
a screw (#10 x 3/4" (1.9cm)) at each
end of door lintel only.
2
2
building). Repeat to install fascia
gables FG2 on left side of front wall
and right side of rear wall (as you
are facing front of building).
11
5
Install fascia gables
5
FG1 on right side of
front wall and left
side of rear wall (as
you are facing front of