Installation Checklist - Amana Side-by-Side El Manual Del Propietario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Checklist

This checklist is for personal records only.
Consumer Installer
Notes
Consumer's Signature
Doors
Doors are aligned with each other. (After food has been added to refrigerator ,
consumer should check door alignment).
Doors seal completely to refrigerator cabinet.
Handles are solidly attached to doors.
Touchmatic
Electronic and Ice 'N Water
If doors were removed to install refrigerator, top hinge wire connectors are
reconnected.
Leveling
Refrigerator is stable.
Toe grille is properly attached to refrigerator.
Ice Maker
Water supply to refrigerator is turned on.
Water leaks are not present at connection between household water supply and
refrigerator. (After 24 hours, consumer should check connection for water leaks.)
Ice maker arm is in on position for ice production. (It may take up to 24 hours for
first harvest of ice.)
Product Literature
Owner's manual is reviewed including the following information.
• product registration card
• Refrigerator and freezer controls
• Chiller Fresh
system
• Garden Fresh
crispers
• normal operating sounds
Water Filter (some models)
Bypass cartridge is removed and water filter is installed
Water leaks are not present around filter head
Installer's Signature
Dispenser Models
Installer's Company Name/Phone Number
8
Date
Tabla de contenido
loading

Este manual también es adecuado para:

12415702

Tabla de contenido