Installation Checklist - Amana SM22TBL Manual Del Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Checklist

This checklist is for personal records only.
Consumer
Installer
Notes
Consumer's Signature
Doors
Doors are aligned with each other. (After food has been added to refrigerator ,
consumer should check door alignment).
Doors seal completely to refrigerator cabinet.
Handles are solidly attached to doors.
Touchmatic
Electronic and Ice 'N Water
If doors were removed to install refrigerator, top hinge wire connectors are
reconnected.
Leveling
Refrigerator is stable.
Toe grille is properly attached to refrigerator.
Ice Maker
Water supply to refrigerator is turned on.
Water leaks are not present at connection between household water supply and
refrigerator. (After 24 hours, consumer should check connection for water
leaks.)
Ice maker arm is in on position for ice production. (It may take up to 24 hours
for first harvest of ice.)
Product Literature
Owners manual is reviewed including the following information:
• product registration card
• Fresh Food and Deepfreeze
• Chiller Fresh
system
• Garden Fresh
crispers
• normal operating sounds
Installer's Signature
Dispenser Models
®
controls
Installer's Company Name/Phone Number
6
(Some models)
Date
Tabla de contenido
loading

Este manual también es adecuado para:

Sm22tbw

Tabla de contenido