Initial Start-Up - clage M 3 Instrucciones De Operación E Instalación

Ocultar thumbs Ver también para M 3:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 196
EN
Installation
M 3, M 4 (230 V)
Fig. 6: "Circuit diagram"
3.5 Initial start­up
Do not switch on the electric power at this time!
1. To purge the instantaneous water heater, open the hot water tap and wait until the water
emerges free of air bubbles.
2. Switch on the electric power.
3. Adapt the water flow if necessary, if for example the temperature is not reached. The proce-
dure is described in the chapter "Use".
4. Explain the functions and use of the instantaneous water heater to the user and hand over
these operating instructions to the user for information and future reference.
5. Register the appliance with the customer service department using the registration card or
online at www.clage.com.
M 6 (230 V)
28
M 7 (400 V)
Tabla de contenido
loading

Este manual también es adecuado para:

M 4M 6M 7

Tabla de contenido