Screwed connection:
Cable cross-section:
1.
Function
Cable type
2.
Function
Cable type
Table 7.2.2
DANGER! Life-threatening danger posed by electric shock
If the mains and SSM cores are both in the same 5-wire cable (Tab. 7.2.2, version 2), the
SSM core may not be operated with protective low voltage, otherwise there could be
voltage transmission.
NOTE: Prepare a 5-wire cable (provided on-site) for mains and SSM connection in acc.
with fig. 4d and connect according to fig. 4f.
7.2.3 Connect the AC pump to an existing three phase net
Mains connection 3~230 V:
L1, L2, L3 and PE available. No neutral conductor N.
The voltage between any two phases must be 230 V.
NOTE: Make sure that 230 V is applied between the phases (L1-L2, L1-L3 or L2-L3).
Two phases (L1-L2, L1-L3 or L2-L3) are to be applied at the terminals L and N of the plug.
Mains connection 3~400 V:
1. L1, L2, L3, PE and neutral conductor N available (fig. 5).
The voltage between the neutral conductor (N) and any phase (L1, L2 or L3) must be
230 V.
2. L1, L2, L3 and PE available. No neutral conductor N.
The pump must have a mains transformer (accessory) connected upstream for pro-
viding the connection 1~230 V (L/N/PE).
8 Commissioning
Do not fail to observe the danger information and warnings in chapters 7, 8.5 and 9!
Prior to commissioning the pump, check that it was installed and connected correctly.
8.1
Filling and bleeding
NOTE: Incomplete bleeding will result in noises in the pump and unit.
Properly fill and bleed the system. The pump rotor compartment is vented automatically
after a short operating period. Dry running for short periods will not harm the pump.
Installation and operating instructions Priux master/-D
M20 (left connection)
8...10 mm
Mains line
2
min. 3x1.5 mm
2
max. 3x2.5 mm
Mains cable and SSM
2
max. 5x1.5 mm
M20 (right connection)
8...10 mm
SSM
2
min. 2x0.5 mm
2
max. 2x1.5 mm