Levolor Cellular Shades Guia De Instalacion página 13

Ocultar thumbs Ver también para Cellular Shades:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

OUTSIDE MOUNT (OM)
STEP 3: INSTALLING THE SHADE
Hang the curved front side of the headrail on the front lip of the brackets.
Rotate the headrail backwards toward the window until a snapping sound is heard.
This will let you know the shade is engaged in the brackets.
Install the included operating handle(s) (see additional instructions on page 14).
CAUTION: Do not use more than one spacer block. Using more than one
!
spacer block could cause shade to fall resulting in possible injury.
INSTALLATION
Front lip
Front Lip
Spring tab
Spring Tab
Headrail
Front lip
Spring tab
Cordless Lift Control
Headrail
Headrail
13
Tabla de contenido
loading

Productos relacionados para Levolor Cellular Shades

Tabla de contenido