MAINTENANCE CHART OF THERMAL INSTALLATIONS IN BUILDINGS
Nominal Thermal Power.
70 kW <P (Heat generator) ≤ 5,000 kW.
Documentation coding:
Cm Maintenance certificate (model C0030).
Mm Maintenance contract signed with an authorized maintenance company.
01 Checking and cleaning, if applicable, the boiler flue gas circuit.
02 Checking and cleaning, if applicable, the smoke ducts and chimney.
03 Cleaning the boiler burner.
04 Review of the expansion vessel.
05 Review of water treatment systems.
06 Checking refractory material.
07 Checking the sealing between burner and boiler.
08 Checking water levels in circuits.
09 Checking the tightness of piping circuits.
10 Checking the tightness of interception valves.
11 Checking the setting of safety elements.
12 Review and cleaning of water filters.
13 Review and cleaning of heat recovery devices. (If you have them).
14 Review of water-air terminal units. (If you have them).
15 Review of circulation pump or pumps.
16 Review of the domestic hot water preparation system. (If you have them).
17 Review of the state of thermal insulation.
18 Review of the automatic control system.
Review of exclusive devices for the production of HW with nominal thermal power ≤ 24.4 kW.
19
(If you have them).
20 Checking the storage status of solid fuel.
21 Opening and closing of the collapsible container in solid fuel installations.
22 Cleaning and removal of ash in solid fuel facilities.
23 Visual control of the biomass boiler.
Checking and cleaning, if applicable, the boiler flue gas circuit and flue pipes and chimneys in
24
biomass boilers.
25 Review of the security elements in biomass installations.
S Once a week.
M Once a month; the first at the beginning of the season.
T Once per season (year).
Twice a season (year); one at the beginning of it and another in the middle of the period of use, provided there is
2 T
a difference of at least two months between the two.
TABLE 2 PERIODIC EVALUATION OF THE PERFORMANCE OF HEAT GENERATING EQUIPMENT.
01 Temperature or pressure of the carrier fluid at the inlet and outlet of the heat generator
02 Ambient temperature of the room or engine room
03 Combustion gas temperature
04 CO and CO2 content in combustion products
05 Smoke opacity index in solid or liquid fuels and solid particle content in solid fuels
06 Shot in the fume box of the boiler
Made by.
Maintenance company.
Manual of use and
maintenance.
TABLE 1 PREVENTIVE MAINTENANCE OPERATIONS.
Maintenance operations.
Measurements in heat generators
Program
Tables 1 and 2
51
Documentation
Cm / Mm
Periodicity
2 T
2 T
M
M
M
2 T
M
M
T
2 T
M
2 T
2 T
2 T
M
M
T
2 T
-
S
2 T
M
s
M
M
Periodicity
3m: every three
months, the first
at the beginning
of the season.
Tabla de contenido
loading

Tabla de contenido