This deposit has a valve release that is operated from the handlebar through a wire and will need to connect it
once assembled.
The wire jacket E, Fig.10 is rolled next to the tank, this will pass under the metal strap that is at the top of
the tail of the gearbox which serves for fixing the handlebar S, Fig.10. Insert the wire through the hole that has
handlebar lever Q, Fig.10 to access the drive lever F, Fig.10 to that fixed by attaching the terminal based on its
corresponding housing and tightening the setscrew on the wire.
To facilitate the entry and exit of the wire with its jacket by the holes in the handlebar, do not install cable
terminals until the cable has not guided by the machine.
4.4 MACHINES WITH PETROL ENGINE.
HALCON models are supplied with engine oil and without fuel.
Must be read the manual of the engine itself.
Avoid fuel linking on the machine filling the tank due can be dangerous or affects some element of it.
Before starting the engine check the oil level in the crankcase by placing the machine on a flat surface and the engine
stopped, if necessary, fill to complete the level with the type of oil recommended by the engine manufacturer.
4.5 MACHINES WITH 3PHASE ELECTRIC MOTOR
These models are supplied with three-phase 230/400V electric motor with switch sockets. The extension cord used
must have a minimum area from 4x2, 5 mm
end is placed the extender or air base that includes the machine in endowment, and the other an air jack which is
compatible with the output of the switchboard where you go to plug.
The three-phase electric motor models leave the factory are always connected to work at 400V. If necessary connect
the machine to a supply voltage of 230V, we change the position of the flat in the motor terminal box, as shown in the
figure below:
2
up to 25 meters length. For a greater distance it will be 4x4 mm
-8-
ENGLISH
2
. At one