Delta 17T Serie Manual Del Propietário página 4

Ocultar thumbs Ver también para 17T Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation
2
Showerhead and Tub Spout Installation
A.
FOR TUB SPOUT INSTALLATION:
Refer to the installation instructions supplied with your spout. Do not connect deck mount spouts to in-wall
valves. Do not use hand showers connected in lieu of a tub spout to a tub/shower valve. Do not use PEX
tubing for tub spout drop.
B-1
B-2
68883 Rev. H
2
1
3
2
1
1
FOR SHOWERHEAD INSTALLATION:
Apply plumber tape to pipe threads on both ends
of the shower arm (1). To prevent damage to finish
on shower arm, insert wall end of shower arm into
shower flange (2) before screwing arm into riser
connection.
Thread showerhead (3) onto shower arm. Do not
overtighten showerhead.
Slip-On Installation
The copper tube (1) must be 1/2" nominal copper.
Important: If it is necessary to cut the copper tube,
the end must be chamfered free of burrs to prevent
cutting or nicking O-ring inside the spout. Slide
spout over copper tube flush with the finished tub
or wall surface. Tighten set screw (2), but do not
overtighten.
Iron Pipe Installation
Install threaded pipe nipple (1) to extend past
finished wall. Apply plumber tape to threads on
pipe nipple and screw on tub spout.
4
Tabla de contenido
loading

Tabla de contenido