Honeywell UV2400U Manual Del Usuario página 5

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Typical Mounting Locations
We recommend the UV Air Purifier be installed on the supply side duct just above the
A-coil, but it can also be installed on the return side if necessary. See Figures 1 and 2.
The germicidal UV light should also be positioned to shine on the surfaces that are
prone to mold growth like the A-coil, or be placed in an open area of the return duct
where there are long straight runs.
WARNING: Do not mount device in location that allows ultraviolet light to be seen
after installation other than by the UV protected lamp handle or sight glass.
Important: Some materials inside the A-coil (including filter media, flex duct, wiring
etc.) may not be UV light resistant. Cover materials affected by UV light with UV
shielding or reflective tape.
The AirBRIGHT Odor Absorber unit should be oriented so that the air flows past the
UV Light first then into the AirBRIGHT Odor Absorber.
5
Tabla de contenido
loading

Tabla de contenido