Periodic Maintenance - Chicago Pneumatic CP Serie Instrucciones De Seguridad Y De Funcionamiento

Martillos neumáticos
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 70
Safety and operating instructions
7. When replacing the rubber grip (A), use
LOCTITE® 415™ (LOCTITE is a registered
trademark of Henkel Corporation, 415 is a
trademark of Henkel Corporation) or similar to
glue the inner flange of grip to the handle. See
illustration below (valid for CP 1210 SVR, CP
1260 SVR and CP 1290 SVR).
A
CP 1210 SVR, CP 1260 SVR and CP 1290 SVR
8. Before assembling the back head onto the
cylinder, check that the seal protrudes
approximately (B)
1
16
of the cylinder. See illustration shown below.
20
www.CrowderSupply.com • Toll Free: 888-883-5144
A
" (1.6 mm) from the face
B
CP 1210, CP 1260, CP 1290

Periodic maintenance

After each operating period of approximately 150
impact hours or twice a year the machine must be
dismantled and all parts be cleaned and checked.
This work must be performed by authorized staff,
trained for this task.
1. Be sure that mating surfaces are clean and
smooth and that the bolts are tight.
2. Thoroughly clean and inspect internal parts and
make sure they are free from rust, grit and
foreign matter.
3. Thoroughly clean and inspect valve parts. Be
sure that the valve moves freely.
4. Make sure that striking faces on the anvil block
are parallel and flat. If the block is cupped, grind
off high edges but do not touch the polished
face where the anvil strikes the steel shank.
Maximum allowed wear (A)
illustration shown below.
A
9800 1351 90 | Original instructions
in. (1mm). See
1
32
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Cp 1210Cp 1260Cp 1290

Tabla de contenido