Factory Setting Of Pump; Maintenance, Servicing; Deblocking - Biral A 402 V2 Instrucciones De Instalación Y Funcionamiento

Bombas de circulación
Ocultar thumbs Ver también para A 402 V2:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 100
76
961207_00
english

7.7 Factory setting of pump

Proportional pressure
LED lights yellow
Control characteristic set to 1
1
LED lights yellow
Power limiting ON
Switch 1
(section 5.3)
ON
Error message
Switch 2
(section 5.2)
OFF

8. Maintenance, servicing

Before performing maintenance on the pump,
make sure that the pump is taken out of operation,
disconnect all poles from the power grid, and secure
from switching on again.
Only have trained staff do this work.
Mind the operating instructions.
Only perform this work when the system is at standstill.
Take the pump off power.
Switch off the fuse and put on warning signs.
The media in the system may scald you.
The hot surfaces may scald you.

8.1 Deblocking

Switch off the pump.
Close the shut-off device before and after the pump.
Do not touch the pump – danger of scalding.
The pump, motor, and electronics may be very hot
(80 °C).
Once the screw plug has been loosened (water will drip out
of the slack), deblock the rotor shaft with a screwdriver.
Turn the end of the shaft until the resistance is reduced.
Put on the screw plug.
Open the shut-off device before and after the pump.
Switch the pump on.
The pump rotor may be blocked depending
Warning
on the operating pressure (leaks at slider).
Tabla de contenido
loading

Tabla de contenido