Unpacking.and.installation - Technogym RUN MED Manual Del Usuario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 193
6 Unpacking and installation
Depending.on.the.country.of.destination,.
rUN.can.either.come.partially.assembled.
in. a. cardboard. pack. attached. to. a.
pallet;.or.fully.assembled,.wrapped.in.a.
transparent.plastic.sheet.and.attached.
to.a.pallet.
the.packed.material.can.be.lifted and
carried. with. normal. lifting. equipment..
the.instructions.are.printed.directly.on.
the.pack.
In.order.to.ensure.the.safety.of.persons.
and.property,.you.should.think.carefully.
about. what. lifting. and. transport.
equipment. to. use,. in. relation. to. the.
equipment's.place.of.destination.
the.unpacking.instructions.are.printed.
directly.on.the.pack.
Unpacking. and. assembly. must. be.
performed. exclusively. by. personnel.
authorized.by.technogym.
16
0SM00427AE-M1_UK.indd 16
02082016
W
arning
observe the legally stated urban
waste disposal procedures when
disposing of the packaging
material.
run excite
02/07/2010 9.49.37

Hide quick links:

Tabla de contenido
loading

Tabla de contenido