Drain the coils during commissioning.
To prevent any inopportune opening of the thermo-actuators, the temperature of the
air surrounding the thermo-actuators should be kept at no higher than 50°C. This
To protect against the risk of condensation when using chilled water, lagging should be
placed along the entire lengths of pipes and completely sealed at its ends. When using
the water coil and electric heater, we advise against using cross-linked polyethylene
deterioration of the PEX pipe near the unit and cause it to burst. We recommend using
Ensure that the electrical supply is disconnected before working on the unit.
!
Only personnel qualified to perform electrical work may carry out installation
and maintenance work.
As indicated on the data plate, the unit must be connected to a single-phase 230V
Motor
Reference
V5
V4
Input power
V3
(W)
V2
V1
V5
V4
Input current
V3
(A)
V2
V1
The unit must be earthed. CIAT shall not be liable for incidents resulting from faulty
102/104
202/204
302/304
33
58
31
41
29
36
27
31
26
27
0.14
0.25
0.13
0.18
0.13
0.16
0.12
0.13
0.11
0.12
EN-5
402/404
502/504
88
106
67
93
52
80
42
72
35
63
0.38
0.46
0.29
0.40
0.23
0.35
0.18
0.31
0.15
0.27
units
602/604
108
135
94
114
79
99
72
88
63
77
47
0.59
0.41
0.50
0.34
0.43
0.31
0.38
0.27
0.33
N 09.60 F
EN
loading