INSTALLATION, PROGRAMMING AND MAINTENANCE
1.
It is compulsory for the machine to be earthed to avoid the possibility of people being given
shocks or damage to the equipment.
In all cases, the machine should be connected in compliance with local and/or national
regulations and legislation.
The machine should be powered via a differential switch (RCD) not exceeding 30 mA.
It is advisable to ensure that the mains power distributor is equipped with a disconnect
device with a contact separation of at least 3 mm.
The plug must be easily accessible once the installation is complete. The use of extension
cables, adaptors and multiple sockets is not permitted.
These procedures must be carried out only by personnel with specific knowledge of the
machine in terms of electrical safety and health regulations.
1.1. UNPACKING
Raise the machine and withdraw the metal supports using a No. 24 spanner (Fig. 1).
Screw the supports into the holes where the packaging screws were located (Fig. 2).
The height between the base of the machine and the ground must be approx. 90mm.
Open the door and remove the wooden strips that are merely for transportation purposes.
(Fig. 3).
Remove the adhesive tape holding the movable elements in place.
Remove the expanded Polystyrene holding the machine. (Fig. 3A)
1.2. INSTALLATION
Position the machine in an aired place away from rain and heat sources (heaters, sunrays,
etc.)
Level the machine by manipulating the supports until it is in a fully horizontal position and
the door fits perfectly. (Fig. 2).
Keep the machine upright one hour before connecting so that the compressor oil returns to
its original place and is not damaged.
Leave a gap of 10 cm behind the machine to ventilate the Cooling Unit and do not place
anything below it. (Fig. 6)
Before connecting to the mains, ensure that the machine voltage and frequency coincide
with your electrical installation. See the registration plate. (Fig. 7).
Use a socket with an efficient earth protected by a 0.03A trip switch and a general switch.
The machine must be installed in a place with good ventilation.
The machine is not prepared to be installed outdoors.
Before switching the machine on it is advisable to clean all the parts that will come into
contact with the juice, i.e. the cups, filter, tray, blade, squeezing tray, balls and cover.
1.3. INITIAL START-UP
A.
Leave your ZUMMO VENDING in an upright position, without working, for one hour.
B.
Activate the green switch (Scheme 1, No.18).
C.
Fill the WATER CONTAINER (Scheme 1, No. 2 with drinking water and introduce the
suction pipe to the bottom.
D.
Ensure that the evaporator waste pipe (Scheme 1, No. 16) is positioned so that the waste
water falls into the WASTE WATER CONTAINER ( Attention: During the orange loading or
machine cleaning process, in which the machine door is open, it is normal that some water
may fall).
E.
Place the WATER LEVEL SENSOR hanging above the mouth of the WASTE WATER
CONTAINER (Scheme 1, No. 17) (Fig. 10) (This sensor serves as a ballcock so that the
waste water does not overflow).
F. At the inner top left of the machine is a Door Switch (Scheme 1, No. 10) with three
positions:
27