Installation Procedure - Toto Kiwami Renesse TBKT Manual De Instrucciones Y Del Propietario

Válvula por llave de bañera
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1. Before installation, the
water pipes must be
completely flushed of dirt
and debris.
2. Drill holes as specified
in the illustration to the
right. Make sure the
rough deck and selected
finished deck materials
meet the following
specifications:
Rough Deck
Thickness
Min
Max
9/16"
1-1/4"
(15 mm)
(32 mm)
CAUTION
The bath basin must be
parallel to the center line of
the faucet installation hole.

insTallaTion PRoCeDURe

Finished Deck
Thickness
Min
Max
1/2"
3/4"
(13 mm)
(19 mm)
Hole Diameter
1-3/4" (44 mm) MIN.
1-13/16" (46 mm) MAX.
4
3-15/16"
3-15/16"
(100 mm)
(100 mm)
Center line
Bath basin side
RIM WIDTH (TUB)
distance between TUB edge
and valve
Less than 7-7/8" (200mm)
WATER SUPPLY LINE
Hole Diameter
1-3/4" (44 mm) MIN.
1-13/16" (46 mm) MAX.
Hole Diameter
1-5/8" (42 mm) MIN.
1-3/4" (44 mm) MAX.
minimum distance
2-3/8" (60mm)
Tabla de contenido
loading

Tabla de contenido