Installation Instructions; Receiving Inspection; Materials Required (Obtain Locally) - Alliance Laundry Systems JT30XG Manual De Instalación, Operación, Mantenimiento Y Seguridad

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Instructions

RECEIVING INSPECTION

Upon delivery, visually inspect crate carton and parts for
any visible shipping damage. If the crate, carton or cover
are damaged or signs of possible damage are evident,
have the carrier note the condition on the shipping papers
before the shipping receipt is signed, or advise the carrier
of the condition as soon as it is discovered.
Remove the crate and protective cover as soon as possible
and check the items listed on the packing list. Advise the
carrier of any damaged or missing articles as soon as
possible. A written claim should be filed with the carrier
immediately if articles are damaged or missing.
IMPORTANT: Remove the shipping tape from the
two back draft dampers located in the exhaust
thimble.
M414670
© Published by permission of the copyright owner – DO NOT COPY or TRANSMIT
SECTION III
MATERIALS REQUIRED
(Obtain Locally)
GAS, ELECTRIC OR STEAM DRYING
TUMBLERS
• One fused disconnect switch or circuit breaker.
GAS DRYING TUMBLERS ONLY
• One gas shut-off valve for gas service line to each
tumbler.
STEAM DRYING TUMBLERS ONLY
• One steam shut-off valve for steam service line to be
connected upstream of solenoid steam valve.
• Two steam shut-off valves for each condensate return
line.
• Flexible steam hoses with a 125 psig (pounds per
square inch gauge) (8.79 kg/sq. cm) working pressure
for connecting steam coils. See Figure 25, 26 and 27
for sizing and connection configurations.
• Two steam traps for steam coil outlet to condensate
return line. (Three for 120 and 170 pound tumblers.)
• Two vacuum breakers for condensate return lines.
(Three for 120 and 170 pound tumblers.)
23

Capítulos

Tabla de contenido
loading

Tabla de contenido