BIP LD2-T017-04-BP _ _ / BP _ _ -S4
Inductive Positioning System
3
Construction and function
3.1
Construction
16
4
0
4 – 0.05
4.4
22
30
Fig. 3-1:
Construction
3.2
Installation instructions
In order to prevent effects on the measurement signal by
the installation material, a metal-free area around the active
surface of the BIP of approximately 1 mm must be
maintained (see Fig. 3-2).
If the BIP detects not only the target, but also another
metal piece, invalid measurement signals
will result.
To obtain a measurement signal with high resolution,
suitable cable routing in the machine and filter measures
for system power supply must be ensured.
The target can be moved in the range
D = 0.5...1.3 mm in front of the active surface in the
direction of measurement (see Fig. 3-3). The resulting
linearity error of the output signal is minimal in the distance
range D = 1.0 ±0.25 mm.
The measuring direction follows the wedge-shaped symbol
on the active surface.
Installation
► Fasten BIP with 2 mounting screws DIN EN ISO 4762
M4 x 10 (max. tightening torque: 0.5 Nm).
6
english
18
Active surface
17.3
Fig. 3-2:
BAM TG-XE-020
target
Fig. 3-3:
3.3
Standard curve (typical gradient)
Position
value
0xFFF
0x000
Fig. 3-4:
Spacing of metal-free area
17.5 ±4
Distance from measuring surface
SLmin
Characteristic curve
SLmax
Measuring position