Addition Of Refrigerant - Mitsubishi Electric Mr.Slim PUZ-ZM200YKA Manual De Instalación

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
4. Installing the refrigerant piping
A
C
D
E
F
G
A Stop valve <Liquid side>
B Stop valve <Gas side>
C Service port
D Open/Close section
Fig. 4-5
(1)
B
A
D
C
I
J
F
E
Fig. 4-6
A Valve
I Double spanner section
B Unit side
(Do not apply a spanner other than to this section.
C Handle
Doing so would cause coolant leaks.)
D Cap
J Seal section
E Local pipe side
(Seal the end of the heat insulation material at the
F Pipe cover
pipe connection section with whatever seal mate-
G Service port
rial you have on hand so that water does not infil-
H Wrench hole
trate the heat insulation material.)
B
C
Fig. 4-8
4.6. Addition of refrigerant
• Additional charging is not necessary if the pipe length does not exceed 30 m.
• If the pipe length exceeds 30 m, charge the unit with additional R32 refrigerant
according to the permitted pipe lengths in the chart below.
* When the unit is stopped, charge the unit with the additional refrigerant through
the liquid stop valve after the pipe extensions and indoor unit have been vacu-
umized.
When the unit is operating, add refrigerant to the gas check valve using a
safety charger. Do not add liquid refrigerant directly to the check valve.
Outdoor unit
30 m and less
ZM200
ZM250
No additional
charge necessary
M200
M250
B
H
I
E Local pipe
F Sealed, same way for gas side
G Pipe cover
H Do not use a wrench here.
Refrigerant leakage may result.
I Use two wrenches here.
(2)
B
G
A
H
I
J
F
E
Fig. 4-7
A
* The figure to the left is an example only.
The stop valve shape, service port posi-
tion, etc., may vary according to the model.
* Turn section A only.
(Do not further tighten sections A and B
D
together.)
C Charge hose
D Service port
Amount of additional refrigerant charge (kg)
31 - 40 m
41 - 50 m
0.4 kg
0.8 kg
0.6 kg
1.2 kg
0.4 kg
0.8 kg
0.6 kg
1.2 kg
4.4. Refrigerant pipe airtight testing method (Fig. 4-5)
(1) Connect the testing tools.
• Make sure the stop valves A B are closed and do not open them.
• Add pressure to the refrigerant lines through the service port C of the liquid
stop valve A.
(2) Do not add pressure to the specified pressure all at once; add pressure little by
little.
1 Pressurize to 0.5 MPa (5 kgf/cm
sure does not decrease.
2 Pressurize to 1.5 MPa (15 kgf/cm
pressure does not decrease.
3 Pressurize to 4.15 MPa (41.5 kgf/cm
perature and refrigerant pressure.
(3) If the specified pressure holds for about one day and does not decrease, the pipes
have passed the test and there are no leaks.
• If the surrounding temperature changes by 1 °C, the pressure will change by
about 0.01 MPa (0.1 kgf/cm
(4) If the pressure decreases in steps (2) or (3), there is a gas leak. Look for the
source of the gas leak.
4.5. Stop valve opening method
The stop valve opening method varies according to the outdoor unit model. Use the
appropriate method to open the stop valves.
(1) Gas side (Fig. 4-6)
1 Remove the cap, pull the handle toward you and rotate 1/4 turn in a counterclock-
wise direction to open.
D
2 Make sure that the stop valve is open completely, push in the handle and rotate
the cap back to its original position.
(2) Liquid side (Fig. 4-7)
1 Remove the cap and turn the valve rod counterclockwise as far as it will go with
the use of a 4 mm hexagonal wrench. Stop turning when it hits the stopper.
(ø9.52: Approximately 10 revolutions)
2 Make sure that the stop valve is open completely, push in the handle and rotate
the cap back to its original position.
Refrigerant pipes are protectively wrapped
• The pipes can be protectively wrapped up to a diameter of ø90 before or after
connecting the pipes. Cut out the knockout in the pipe cover following the groove
and wrap the pipes.
Pipe inlet gap
• Use putty or sealant to seal the pipe inlet around the pipes so that no gaps remain.
(If the gaps are not closed, noise may be emitted or water and dust will enter the
unit and breakdown may result.)
Precautions when using the charge valve (Fig. 4-8)
Do not tighten the service port too much when installing it, otherwise, the valve core
could be deformed and become loose, causing a gas leak.
After positioning section B in the desired direction, turn section A only and tighten it.
Do not further tighten sections A and B together after tightening section A.
Warning:
When installing the unit, securely connect the refrigerant pipes before starting
the compressor.
* After charging the unit with refrigerant, note the added refrigerant amount on
the service label (attached to the unit).
Refer to the "1.5. Using R32 refrigerant air conditioners" for more information.
• Be careful when installing multiple units. Connecting to an incorrect indoor unit
can lead to abnormally high pressure and have a serious effect on operation
performance.
/ R32 maintenance refilling: Before servicing refilling the equipment with R32 to
ensure that there is no risk of explosion from electrical sparks it must be ensured
that the equipment machine is 100% disconnected from the mains supply.
A+B+C+D
51 - 60 m
61 - 70 m
1.2 kg
1.6 kg
1.8 kg
2.4 kg
1.2 kg
1.6 kg
1.8 kg
2.4 kg
G), wait five minutes, and make sure the pres-
2
G), wait five minutes, and make sure the
2
G) and measure the surrounding tem-
2
G). Make the necessary corrections.
2
71 - 100 m
Calculate the amount of additional refrigerant
charge using formula provided next page
en
/Maximum
amount of
refrigerant
9.2 kg
9.2 kg
7.2 kg
9.2 kg
9
Tabla de contenido
loading

Este manual también es adecuado para:

Mr.slim puz-zm250ykaMr.slim puz-m200ykaMr.slim puz-m250yka

Tabla de contenido