13
OPERATION
Machine to be operated in a perfect state only. Inspect the device visually every time it is to be
used. Check in particular the safety equipment, electrical controls, electric cables and screwed
connection for damage and if tightened properly. Replace any damaged parts before operating the
device.
13.1 Information on Initial Start-up
Note that the machine is delivered without engine oil and fuel. Make sure that
this equipment is filled up before the machine is put into operation for the first time.
ATTENTION: The machine does not start until the engine oil has been refilled
to the upper limit.
13.1.1 Test Run Initial Start-up
Let the machine run idle for about 3 minutes.
Pay attention to abnormal noises.
Pay attention to the exhaust fumes (too black, too white)?
13.1.2 Notes on the first 20 operating hours
In order to optimize the life expectancy of your machine, the following points should be
observed:
Do not operate the engine for the first 20 operating hours @ maximum load (this also
applies to used engines after extensive maintenance). This means lower speed and lower
maximum working load than during normal operation.
Change the engine oil after the first 20 hours of operation.
13.2 Operation instructions
Do not stand in the discharge chute area during starting the machine
Before starting check that the in-feed the free from any material
Start shredding after the engine has reached full speed
Operating only with sharp blades
Use only blades allowable for this machine!
Never use damaged blades!
Always operate in the operator zone
Never stay in the in-feed zone
Never use the recoil-starter while the engine is running. This will damage
the engine
Do not operate the machine on slopes of more than 20°, as even with an
optimum oil level the engine may not be supplied with sufficient lubrication.
ZIPPER MASCHINEN GmbH
ZI-HAEK4100 / ZI-HAEK11000
N O T I C E
Stop the machine before any break, maintenance and cleaning!
The safety switch must be rightly connected! RISK OF INJURY!
www.Zipper-Maschinen.at
W A R N I N G
N O T I C E
OPERATION
33