Electrical Wiring - Riello BS1D Instrucciones De Instalación, Uso Y Mantenimiento

Quemadores de gas de aire soplado
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

3.7 ELECTRICAL WIRING

Main switch
230V ~ 50Hz
Fig. 8
A
E9250
3083
KEY TO LAY-OUT
B5
C
CN1 – Ionisation probe
E
h..
MV – Motor
PA – Min. air pressure switch
PG – Min. gas pressure svitch
RS – Remote reset
SM – Servomotor air damper
SO – Ionisation probe
ATTENTION:
Do not swap neutral and phase over, follow the diagram shown care-
fully and carry out a good earth connection.
The section of the conductors must be at least 1mm². (Unless requested
otherwise by local standards and legislation).
The electrical wiring carried out by the installer must be in compliance
with the rules in force in the country
Connect the 2nd stage thermostat (TR) to terminals T6 - T8 and remove
the bridge.
TESTING
Check the burner has stopped by opening the thermostats.
Check that the burner is blocked by opening the connector (CN1) inserted
in the probe red wire and located outside the control box.
CONTROL BOX, (see fig. 8)
To remove the control box from the burner it is necessary to:
disconnect all the connectors, the 7-pin plug, the high voltage cables and the
earth wire (TB);
unscrew the bolt (A, fig. 8) and pull the control box in the direction of the arrow.
To install the control box it is necessary to:
screw the bolt (A) in at a torque of 1 - 1.2 Nm;
reconnect all the connectors previously disconnected.
NOTES
The burners have been type-approved for intermittent operation. This means they
must stop at least once every 24 hours in order to allow the electrical control box
to check its efficiency on start-up. The boiler limit thermostat (TL) normally en-
sures the burner halts. If this does not happen a time switch halting the burner at
least once every 24 hours must be applied in series to limit thermostat (TL).
8
– 2 nd stage working signal
– Capacitor
connector
– Electrode
– Hour counter
Brown
Blue
Black
GB
S3
– Lock-out signal
(230V - 0.5A max.)
T6A – Fuse
TB – Burner-earth
TL
– Limit thermostat
TR – Adjustment thermostat
TS
– Safety thermostat
V10 – Safety valve
st
V11 – 1
valve
nd
V12 – 2
valve
X..
– plug
XP.. – socket
D4627
CARRIED-OUT
IN THE FACTORY
TO BE DONE BY
THE INSTALLER
Tabla de contenido
loading

Tabla de contenido