5.1.1 Installation instructions for Skylotec D-BOLT AP-058; AP-063-GE and AP-063-
GPS anchor point using WÜRTH injection system W-VIZ/A4 M16 (h
Pay attention to fixing installation instructions and approval (ETA-04/0095).
1
Using a hammer drill, create a bore hole with a drill nominal diameter of d
depth of h
2
Clean the bore hole (blow out 2x oilfree, brush out 2x, blow out 2x oilfree).
3
Attach the mixer to the cartridge using the dispenser gun.
4
Before use, dispense a strand of around 10 cm but do not inject it into the bore hole.
Checking the temperature of the anchor base: The temperature must be ≥ +5°C. Starting from the
5
base of the bore hole, fill the hole with injection adhesive. About 2/3 of the bore hole has to be filled
with injection adhesive.
6
Push in the anchor rod with a slight turning movement down to the bore hole base.
Visually check the amount of adhesive or setting depth marking respectively. The adhesive has to
7
reach the surface. If no adhesive is visible at the surface, the anchor rod must be removed
immediately and WIT-VM 100 injection adhesive injected again.
Comply with the curing time of the injection adhesive. Processing is possible only from a temperature
8
of ≥ +5°C. See the processing notes on the cartridge and the installation instructions.
9
Install AP-063-GE or AP-063-GPS, do not exceed max. torque of 50 Nm.
MAT-MA-0005-00-GB
≥ 130 mm vertically to the surface of the anchor base.
1
D-BOLT
20.07.2018
125)
ef
=18 mm and bore hole
o
Page 6 of 19