English
6. START UP INSTRUCTIONS
6.1. LIST OF MATERIALS
This machine includes the following elements that you
will find inside the box:
• Engine
• U tube
• Screw M5x25 (x2)
• Superior handle
• Nut M5(x2)
• Screw M6x45 (x2)
• Wing nut M6 (x2)
• Clip (x1)
• Cable extension holder (x1)
• On/Off switch screw holders (x2)
• Instruction manual
6.2. MOUNTING
6.2.1. HANDLE INSTALLATION
1. Insert the U tube into the two bottom tubes of the
machine. Place the M5x25 screws through the
holes. Once in place, place the nuts M5 and
tighten.
2. Place the cable holder on the top handle.
3. Place the top handle using the screws M6x45.
Place the two M6 wing nuts and tighten.
4. Old the cable with the clip.
6.2.2. INSTALLATION OF THE ON/OFF SWITCH
1. Place the switch making it coincide with the two
holes in the top handle and tighten the two switch
holder screws into place.
6.3. CHECKING POINTS PRIOR TO USING THE
MACHINE
The current and tension supplied must coincide
with those in the characteristics label. Prior
to starting work check that the machine works
adequately and all security measures work.
Check the machine and look for any loose pieces
(screws, nuts, housing etc) and for any damages.
Tighten, repair or replace those pieces that you have
found to be in a bad state. Ensure that there are no
leakages. Do not use the machine if damaged or not
well regulated.
28/112