Garland 45-0056 Manual De Instrucciones página 28

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
English
5. START UP INSTRUCTIONS
5.1. LIST OF MATERIALS
This machine includes the following elements that you
will find included in the box:
• High pressure machine
• Handle
• Handle fixing screws (2 pcs.)
• Hose bracket fixing screws (2 pcs.)
• Lance
• Adjustable nozzle
• Gun
• High pressure hose
• Electric cable support
• Water inlet connector
• Lance cleaning wire
• Instruction manual
5.2. ASSEMBLY
1. Attach the handle (12)
and secure it with the
screws.
2. Mount the electrical cable
support (11) and the gun
(14).
3. Attach the pressure
hose bracket (13) using
the screws
4. Place the wheels (2)
by pressing lightly
5. Connect the high
pressure hose (9) to the
machine and then to the
gun (7)
6. Connect the water
supply hose to the water
inlet connector (4) and
this to the machine.
7. Connect the lance (6) or the detergent tank (10) to
the gun (7) by pushing and turning 90º.
28/96
loading

Este manual también es adecuado para:

Ultimate 114e-v20Ultimate 114 e