Amana ABL192ZFES Guía De Uso Y Cuidado página 9

Idiomas disponibles

Idiomas disponibles

Installation
Connecting the Water Supply
Materials
Needed:
• Y4"outer diameter flexible copper tubing
• Shut-off
valve (requires
a Y2' hole to be drilled into
water supply line before valve attachmenO
• Adjustable
wrench (2)
• Y4"hex nut driver
Notes:
.
Use copper tubing only for installation.
Plastic is
less durable and can cause damage.
Add 8' to tubing
length needed to reach water
supply for creation of service loop.
Create service loop with copper
tubing
(minimum
2' diameter).
Avoid kinks in the copper tubing
when bending the service loop.
Do not use plastic tubing.
2' diameter
ITII n IITI U nl
2. Remove plastic cap from water valve
inlet port.
.
.
Place brass nut (A) and sleeve (B)
on copper tube end as illustrated.
Reminder:
Do not use an old
sleeve. The nut and sleeve are
provided in the Use and Care
packet.
Place end of copper tubing
into
water valve inlet port. Shape
tubing slightly. Do not kink - so
that tubing feeds straight
into inlet
port.
loading

Este manual también es adecuado para:

Abb2221fezAbb1922fes0Abl2037fes0Abl1922fes0