Bergstrom INTEGRAL POWER II Instrucciones De Montaje página 14

Ocultar thumbs Ver también para INTEGRAL POWER II:
Idiomas disponibles
  • ES

Idiomas disponibles

INTEGRAL POWER II
EN
5
Pass the cabling through the borehole (T)
5
made for this purpose in the roof (figure 1).
Position Integral Power (A) with (6) 13 mm
pieces of bushing, rubber washers and (6)
M6/100x40 screws (B) and nuts M6/100.
Important: Ensure sealtightness between the
!
unit and the ceiling in order to prevent any
water coming in.
5
A
B
Insert rubber washers to prevent water
6a
6a
M6/100 nut
passage.
Flat washer
Rubber washer
Unit base
Bushing
Vehicle roof
Flat washer
Screw M6/100
14
loading

Este manual también es adecuado para:

1003714489