Important: The Integral Power II has 4
!
plates welded to the sides of the base in
order to ensure safe lifting using mechanical
lifting equipment.
Position the Integral Power II unit on
1
the roof, taking into account that the final
position must correspond to the front
supplied, ensuring it is on a flat surface.
Once the position is defined, remove the case
2
and mark (6) boreholes (Y), then align the (4)
template boreholes with the (4) rear boreholes
in the roof (figure 3).
Note the arrow indicating the operation
direction.