FIRST INSTALLATION

6.5
Correct installation of the autoclave is key to ensuring its proper operation. Below is an installation
checklist:
1. The device must be installed in a laboratory accessible only to authorised personnel.
2. The working environment must be properly lit (see UNI standard 10380) and adequately
ventilated.
3. Position the equipment on a perfectly flat and horizontal surface with a minimum load capacity of
70 kg. The autoclave is supplied already levelled. The sterilisation chamber is slightly inclined to the
rear of the equipment.
4. Position the autoclave so as to leave sufficient room for inspecting and cleaning the sterilisation
chamber.
5. Do not install the autoclave close to washbasins or taps: the cover of this equipment is not
watertight.
6. Do not install the equipment close to heat sources (i.e. other autoclaves, ovens or similar).
6.5.1 Water connections for use of machine with demineralizer
The equipment water connections are of primary importance for its correct operation:
Serial port for STS
data logger
A
Condensate
discharge connector:
use it to CONNECT a
silicone hose for
residual steam
condensation.
The hose SHOULD
NEVER touch the water
in the
condensation tank.
If it is present, remove the silicone hose on "A".
"D" is of nut type, for use with a 4/6mm hose.
154 of 228
Dirty water discharge with
use of deminerlizer only:
use for automatic dirty water draining (paragraph 9.3)
MAINTENANCE AND USE MANUAL
EN
D
C
*: RESERVED FOR TECHNICAL
ASSISTANCE PERSONNEL
Water inlet
from mains with use
of demineralizer:
Use as inlet for
filling from water
mains.
Clean water
discharge:
Use ONLY to
discharge the
Clean Water*.
zetaclave B
Tabla de contenido
loading

Productos relacionados para Zhermack zetaclave B

Tabla de contenido