KGXD side by side air routing
Assemble casing sections.
Align flush with each other, horizontally and vertically.
Secure casing sections with unit connector.
Use supplied M8x50 hexagon bolts and M8 nuts.
Only for KG Top.eco units
Unit connection at top with jointing rails and 5.5x16 combi screws.
(using screwdriver bit SW8)
Seal both gaps with sealant.
34
3064441_201802