Ã
Á
À
30
KGXD stacked air routing
Mount 4th plate pack and secure it to packs 2 and 3.
Â
The threaded connections are located on the front and rear of each plate pack.
Sealing tape all
the way round the
edge
Slide the whole plate pack up to the bypass
plate end-stop. This is the final position.
Version: elements split in direction of airflow.
Join all elements together by affixing sealing tape all the way round
the edges, then insert.
3064441_201802